SALIENT FEATURES OF AUGMENTATION OF HNAHLAN WATER SUPPLY SCHEME (SOLAR PUMPING)

(Funded under NABARD RIDF-XXIV)

1State:Mizoram
2District:Champhai District
3Habitation:Hnahlan
4Source:Kurung Stream
5Population base year:2020 AD
6Population Design year:2040 AD
7Design period:20 years
8Design population:8383 souls
9Design Water Demand:0.46 Mld
10Design supply level:55 lpcd
11Delivery System:Solar Pumping System
12Distribution System:Dead End/Tree System
13No. of target habitation:1 town
14Intake structures:RCC Weir & Intake
15Approx. location of Intake:23°42'20.82"N; 93°23'33.01"E
16Method of water treatment:a) Plain Sedimentation Tank



b) Rapid Sand Filtration
17Nos. of pumping stages:3
18Location of Stage-I:23°42'18.75"N; 93°24'0.50"E
19Location of Stage-II:23°42'4.83"N; 93°23'44.95"E
20Location of Stage-III:23°42'7.49"N; 93°23'18.68"E
21Pump Specifications:Stage I



Flow Rate: 1.4-73 m3/hr Motor Power: 19.5-75.4 KW



SPV Power Plant: 110.88 KWp



Stage II



Flow Rate: 0.88-73 m3/hr Motor Power: 19.5-71.90 KW SPV Power Plant: 105.60 KWp



Stage III



Flow Rate: 0.88-65 m3/hr Motor Power: 19.5-72.50 KW SPV Power Plant: 110.88 KWp
22Static head:550 m
23Gravity main:80mmØ GI(M) 1000 m length
24Pumping Main:80mmØ GI(M) 5000 m length
25Service Reservoir:2 Nos. Of 4 lakh litres capacity
26Building:(i) Site Office



(ii) Duty Room
27Mode of Execution:Departmental & Contract
28Project Duration:36 months
29Estimated Amount:Rs. 10,65,57,000.00
30AA & ES No. & Date:No.G.20012/1/2009-PHE/Pt Dt 5th August, 2019.