Vawiin Dt.18.12.2023 (Monday) chawhnu khan Muthi Water Supply Scheme chu Er. C.Lalremsiama, Secretary, PHED chuan a hawng. He Scheme hi NABARD RIDF-XXVII hnuaia thawh niin Project cost chu ₹415.21 a ni a. A thawktu contractor chu P&V Eastern Engineers, Hunthar, Aizawl a ni. He WSS hmang hian Muthi khua a mipui 1255 hnenah nitin tui 55 lpcd pek a ni dawn a, Solar pumping hmangin Muthi khaw hnuai 2.1km a Manapa lui chu pump chhoh a ni.
Close Menu
HomeWater Supply SchemesPHE BillingFAINA AW
About Us
Prog. & Schemes
Acts, Rules & Guidelines
The Mizoram Right to Public Services Act,2015 (Act No.6 of 2015)Water Tariff RatesRecruitment RulesWATSAN Committee GuidelinesOther Notifications and Circulars
The Mizoram (Protection of Rivers)
The Mizoram Ground Water (Control & Regulation)
The Mizoram Water Supplies Rules
The Mizoram PHED Enlistment of Contractors Rules
Documents
Sample Tender Document for Solar Pumping SystemsJJM Mizoram Year Book 2020-21e-Book 2019-20Standard Bidding DocumentInfrastructures/AssetsEmergency Response Sanitation Unit (ERSU)Ground Water Depletion Survey Report 2020Manual on Storm Water Drainage System
Alternative WSS Aizawl (Gravity) Part-1
Alternative WSS Aizawl (Gravity) Part-1 Volume-IAlternative WSS Aizawl (Gravity) Part-1 Volume-IICorrigendum No.1 For Alternative Water supply Scheme of Aizawl (Gravity) Part-1Corrigendum No.2 :Alternate Gravity Water Supply Scheme of AizawlClarifications to Pre-bid Queries : Alternate Gravity Water Supply Scheme of Aizawl
RTI
Tender/Quotation
Government of Mizoram
Page Links: https://phed.mizoram.gov.in/post/vawiin-dt18122023-monday-chawhnu-khan-muthi-water-supply-scheme-chu-er-clalremsiama-secretary-phed-chuan-a-hawngp
Vawiin Dt.18.12.2023 (Monday) chawhnu khan Muthi Water Supply Scheme chu Er. C.Lalremsiama, Secretary, PHED chuan a hawng
Post Created On: 18th Dec 23 10:39 PM
Updated On: 18th Dec 23, 10:50 PM
Updated On: 18th Dec 23, 10:50 PM
News
Events
OM / Notifications
Circular & Orders
Press Release
Notice Board
Citizen Charter
Public Grievance
SITE STATISTICS SINCE 2018
Total Visitors
1,023
Total Pageviews
2,972
Powered By Google Analytics
ARCHIVES
Department Updates Title
- Regularisation Order - Electrician-II, LDC and Store Keeper
- Condonation of Overage - Regularization of Provisional Employees Scheme, 2020 Dt. 5.11.2024
- Study leave granted to Er.Lalawmpuia, SDO, Kawrthah WATSAN Sub-Division Dt.10/10/2024
- Repatriation order of Er.Lalthanzuali Dt.25/09/2024
- Confirmation of Plumbers Dt.17/09/2024